All Outsiders Village documents

Open this document in Google Drive to comment or view the latest version

Copy saved on . Updated manually.

Outsiders Village: Roadmap (Initial Proposal)

Content updated: September 21, 2026 at 5:50 PM MDT

Purpose

This roadmap describes a path from the current manual beginning of Outsiders Village to a stable, usable, open-source production system. It is intentionally a product-level roadmap rather than a technical task list. The village should be able to begin meeting before the software is finished, and the software should grow in response to real village life rather than requiring people to wait for a complete platform.

Contents

• Roadmap principles

• Phase 0 — Current foundation

• Phase 1 — Begin village life manually

• Phase 2 — Establish the Outsiders Village website

• Phase 3 — Add core village operations

• Phase 4 — Improve event discovery and integrations

• Phase 5 — Add communication and shared resources

• Phase 6 — Distribute control and make leaving practical

• Phase 7 — Production readiness

• Phase 8 — Ongoing village-led development

• What this roadmap is not

Roadmap principles

Phase 0 — Current foundation

The Village already has enough structure to begin operating manually, but until the new Outsiders Village Meetup group exists, most event coordination will depend on villagers texting or otherwise contacting one another directly to decide what to do, when to meet, and who will take on practical roles.

Current foundation includes:

The goal of this stage is to recognize what is already in place and use it as the starting point for the next steps.

Phase 1 — Begin village life manually

Start regular activity before the new website is complete.

Initial gathering types:

For now, villagers who want to create an event will send Robee the event details directly, including the date, time, location, description, RSVP limit, and any other information needed for the listing. Robee will then use admin.itsrobee.net to schedule the event in the new Outsiders Village Meetup group. Roles and other logistics can continue to be coordinated directly with the people involved.

Needed from Robee:

Needed from other villagers:

Ready to move on when:

Village activity is actually happening and the recurring friction of running it manually is clear enough to guide the first website features.

Phase 2 — Establish the Outsiders Village website

Create outsidersvillage.org as a useful home even before it becomes a full application.

Initial website capabilities:

The first version does not need accounts, forums, or sophisticated automation. It should simply make the Village understandable and make current activity easy to find.

Needed from Robee:

Needed from other villagers:

Phase 3 — Add core village operations

Begin moving the work currently handled through direct messages and manual administration into the website.

Core product capabilities may include:

The goal is not to create a large central moderation system. The goal is to let each village manage ordinary village life without needing the infrastructure operator to do it for them.

Needed from Robee:

Needed from other villagers:

Phase 4 — Improve event discovery and integrations

Connect public-facing Village activity to the places people already use to discover events.

Likely capabilities:

The goal is to make public discovery easy without forcing all village activity into a public platform.

Phase 5 — Add communication and shared resources

Add features that help relationships continue between events when real use shows they are needed.

Possible capabilities:

These features should be added because villagers are trying to do something repeatedly, not because a social platform is expected to have every possible feature.

Phase 6 — Distribute control and make leaving practical

Turn the open-source and anti-capture principles into working product capabilities.

Capabilities and infrastructure should increasingly support:

A key test is whether another technically capable person can create a working deployment without depending on private knowledge held by Robee.

Phase 7 — Production readiness

Move from a useful evolving system to one that can be relied on for ongoing Village activity.

Production readiness should include:

Production does not mean finished. It means the system is dependable enough that villages can rely on it without Robee having to personally hold every piece together.

Phase 8 — Ongoing village-led development

After the core system is stable, development should continue from actual use.

Possible directions may include:

The product should remain capable of changing, splitting, shrinking, or being replaced. Success is not one permanent platform. Success is infrastructure that helps people build and sustain the village relationships they actually want.

What this roadmap is not

This is not a promise that every listed feature will be built, nor a fixed release schedule. Priorities should change as people begin using Outsiders Village and reveal which problems are real.

The immediate priority is simpler: start meeting, learn what village life actually needs, and build the smallest useful pieces that help more people participate without requiring Robee to do everything.